Introduction
Set within Leg O’Mutton Field, this new concrete park was built by Maverick and opened in September 2026.
The park is made up of three main sections. At one end is an open bowl, with transitions leading into a central section featuring a down rail, hubba and a unique wavy rail.
The opposite side has a funbox leading up to a textured, brick-style bank, while the far end drops into a two-tiered section with a pocket bowl and snake-run style transition, with a volcano sitting in the middle.
It’s a fairly large plot and there’s a lot packed into it, with plenty of different features and lines to keep you moving around the park.
A varied new park with a good mix of street and transition, and a few unusual features that give it plenty of character.
Lots to explore, with plenty of different lines.
Photos












